What Permits Are Required to Set Up an Industrial Used Oil Recycling Plant in Southeast Asia, the Middle East, and Africa?

Author: Mr. JAY

Senior Petrochemical & Used Oil Recycling Engineer

With practical experience in used oil recycling systems, fuel recovery routes, and industrial optimization, he focuses on converting waste hydrocarbon streams into cleaner and more valuable products.

Setting up an industrial used oil recycling plant requires several approvals, mainly covering environmental impact assessment, hazardous waste treatment, industrial operation, and pollution control. The specific permits depend on the country, the type of used oil, processing capacity, and recycling technology.

This guide focuses on industrial waste oils, including used engine oil, used motor oil, waste lubricating oil, hydraulic oil, and gear oil. It covers facilities that collect, store, filter, dewater, distill, or re-refine used oil into recovered oil products or regenerated base oil. It does not cover used cooking oil or biodiesel production.

What Permits Are Generally Required?

Before comparing individual countries, investors should understand the main approval categories.

Permit / ApprovalMain PurposeWhen It Is Required
Business RegistrationLegally establish the company and register its business activities.For establishing the business.
Investment RegistrationApprove foreign investment or the proposed investment project.Where required by local investment laws.
Land-use / Zoning ApprovalConfirm that the site can be used for industrial waste treatment.Before construction or site development.
Environmental Impact Assessment (EIA)Assess impacts on air, water, soil, and surrounding communities.Depending on project category, capacity, and location.
Environmental Permit / AuthorisationAuthorize regulated environmental activities and establish operating conditions.According to the country’s environmental licensing system.
Waste Treatment LicenseAuthorize the treatment, recycling, or recovery of regulated waste oil.When the facility receives and treats waste oil covered by licensing rules.
Waste Collection / Transportation LicenseAuthorize the collection and transportation of used oil.If the company performs these activities.
Factory / Industrial LicenseApprove the construction and operation of the industrial facility.Depending on factory classification and local thresholds.
Air Emissions / Wastewater ApprovalRegulate exhaust gas, wastewater discharge, and pollution control.When the plant’s emissions or discharges trigger separate controls.
Fire and Safety ApprovalVerify fire protection, oil storage, and workplace safety arrangements.According to local industrial and safety requirements.

Waste collection, transportation, storage, treatment, and re-refining are different activities. A collection or transportation license does not automatically authorize a company to operate a recycling or re-refining plant.

Southeast Asia: Vietnam, Indonesia, and Thailand

Vietnam

Main regulatory authorities: Ministry of Agriculture and Environment and relevant provincial authorities.

Main legal framework:

  • Law on Environmental Protection No. 72/2020/QH14.
  • Decree No. 08/2022/ND-CP, as amended.
Permit / DocumentPurpose
Enterprise Registration Certificate (ERC)Establish the Vietnamese company.
Investment Registration Certificate (IRC)Register the investment project where required.
Environmental Impact Assessment (EIA)Assess environmental impacts if the project falls within the applicable categories.
Environmental License (Giấy phép môi trường)Authorize the project’s regulated environmental activities.
Hazardous Waste Treatment Service EligibilityAdditional conditions apply when the facility receives and treats hazardous waste generated by other companies.
Construction and Fire Safety ApprovalsCover facility construction, fire prevention, and safety requirements.

The distinction between processing a company’s own waste and accepting waste oil from external generators is important. Commercial hazardous waste treatment may trigger additional eligibility and technical requirements. An Environmental License alone should not be assumed to cover every hazardous waste treatment activity.

Indonesia

Main regulatory authorities: Ministry of Environment and relevant environmental authorities; licensing applications are handled through the OSS system.

Main legal framework: Government Regulation No. 22 of 2021 on Environmental Protection and Management.

Permit / DocumentPurpose
Business Identification Number (NIB)Register the business through the OSS system.
Environmental Approval (Persetujuan Lingkungan)Obtain the required environmental approval.
AMDAL or UKL-UPLComplete the environmental assessment applicable to the project category.
Technical Approval (Persetujuan Teknis)Meet technical requirements for regulated pollution control or waste management activities.
Operational Eligibility / SLOComplete applicable operational verification before operation.
B3 Waste Management AuthorizationObtain the authorization required for the relevant hazardous waste treatment or utilization activities.

Used lubricating oil must be assessed under Indonesia’s B3 hazardous and toxic waste classification system. The required authorization depends on whether the plant collects, stores, utilizes, or treats the waste. These activities should not be treated as one general permit.

Thailand

Main regulatory authorities: Department of Industrial Works (DIW) and relevant local authorities.

Main legal framework: Factory Act B.E. 2535 (1992) and industrial waste management regulations.

Permit / DocumentPurpose
Company RegistrationEstablish the company and register its industrial activities.
Factory License (Ror Ngor. 4 / รง.4)Required when the factory’s classification and applicable thresholds trigger licensing.
Industrial Waste Management ApprovalAuthorize the receipt and management of regulated industrial waste.
Waste Transportation / Tracking DocumentsControl the movement of used oil from generators to the recycling facility.
Environmental and Pollution-control ApprovalsAddress emissions, wastewater, and industrial waste residues.
Construction and Fire Safety ApprovalsCover factory construction and safety requirements.

The factory category determines whether a factory license is required and which conditions apply. A facility treating industrial waste may have different requirements from a conventional manufacturing factory. Investors should confirm the classification with DIW before selecting a site.

Middle East: UAE, Saudi Arabia, and Oman

United Arab Emirates (UAE)

Main regulatory authorities: Federal environmental authorities and the competent environmental authority in the relevant emirate.

Main legal framework: Cabinet Resolution No. 33 of 2018 Regarding the Circulation of the Waste Oils.

Permit / DocumentPurpose
Company and Industrial Activity RegistrationRegister the business and intended recycling activity.
Environmental ApprovalObtain approval from the competent environmental authority.
Waste Oil Treatment AuthorizationConfirm authorization to treat and recycle waste oils under the applicable regulations.
Waste Collection / Transportation ApprovalRequired if the company collects or transports used oil.
Industrial and Construction ApprovalsAuthorize site development and industrial operation.
Fire and Safety ApprovalVerify oil storage, processing equipment, and fire protection.

The UAE has a federal framework for waste oils, but local implementation and project approvals are handled by the competent authorities in each emirate. Requirements in Dubai, Abu Dhabi, Sharjah, and other emirates may differ.

Saudi Arabia

Main regulatory authorities: National Center for Waste Management (MWAN) and National Center for Environmental Compliance (NCEC), together with relevant industrial authorities.

Main legal framework: Waste Management Law.

Permit / DocumentPurpose
Company / Investment RegistrationEstablish the company and complete applicable investment procedures.
Environmental PermitObtain the environmental approval required for the facility.
Hazardous Waste Treatment LicenseAuthorize treatment of waste classified as hazardous, where applicable.
Hazardous Waste Collection LicenseAuthorize collection activities, if performed by the company.
Hazardous Waste Transportation LicenseAuthorize transportation activities, if performed by the company.
Industrial and Construction ApprovalsCover factory development and operation.
Pollution-control and Safety ApprovalsAddress emissions, wastewater, residues, and workplace safety.

MWAN distinguishes between hazardous waste treatment, collection, and transportation licensing. A recycling plant receiving used oil for treatment should apply for the authorization that covers its actual operations.

Oman

Main regulatory authority: Environment Authority.

Main legal framework: Environmental Protection and Pollution Control Law and applicable hazardous waste management regulations.

Permit / DocumentPurpose
Company RegistrationEstablish the business and register the relevant activities.
Environmental PermitApprove the facility’s environmental activities.
Waste Management LicenseAuthorize applicable hazardous waste treatment, storage, collection, transportation, or reuse activities.
Waste Management PlanDescribe waste types, quantities, handling, and treatment processes.
Site Coordinates and Facility InformationIdentify the proposed waste management facility.
Civil Defense ApprovalAddress fire protection and safety where applicable.

Oman’s Environment Authority provides a Waste Management License service for companies handling hazardous waste. The application for a treatment facility requires information about the site, environmental permit, and waste management plan.

Africa: South Africa, Kenya, Nigeria, and Tanzania

South Africa

Main regulatory authorities: Department of Forestry, Fisheries and the Environment (DFFE), provincial environmental authorities, and relevant local authorities.

Main legal framework: National Environmental Management: Waste Act 59 of 2008 (NEMWA).

Permit / DocumentPurpose
Company RegistrationEstablish the business.
Environmental AuthorisationApprove listed activities where required.
Waste Management Licence (WML)Authorize waste management activities listed under NEMWA.
Air Emissions Licence (AEL)Control listed atmospheric emission activities where applicable.
Water Use Licence (WUL)Authorize regulated water uses under the National Water Act.
Land-use and Building ApprovalsConfirm the site’s industrial use and construction compliance.

A WML, AEL, and WUL are not automatically required for every used oil recycling project. Their applicability depends on the plant’s activities, thresholds, emissions, and water use.

Kenya

Main regulatory authority: National Environment Management Authority (NEMA).

Main legal framework:

  • Environmental Management and Co-ordination Act (EMCA).
  • Environmental Management and Co-ordination (Waste Management) Regulations, 2024.
Permit / DocumentPurpose
Company RegistrationEstablish the company.
Environmental Impact AssessmentAssess project impacts where required.
Environmental ApprovalObtain the relevant NEMA approval before proceeding with regulated project activities.
Waste Management LicenseAuthorize the operation of a regulated waste treatment facility.
Waste Transportation LicenseAuthorize the transportation of used oil, if undertaken by the company.
Effluent Discharge ApprovalControl wastewater discharge where applicable.
Air Quality ApprovalsAddress regulated industrial emissions where applicable.

Kenya’s 2024 Waste Management Regulations replaced the previous 2006 regulations. A plant treating used lubricating oil should confirm the applicable waste facility license and environmental assessment requirements with NEMA.

Nigeria

Main regulatory authorities: National Environmental Standards and Regulations Enforcement Agency (NESREA) and relevant state environmental agencies, such as LASEPA in Lagos.

Main regulatory framework: Federal environmental regulations and applicable state environmental laws.

Permit / DocumentPurpose
Company Registration (CAC)Legally establish the business.
Environmental Impact AssessmentAssess the project’s environmental impacts where required.
NESREA Environmental PermitsCover applicable waste, toxic substances, air quality, or effluent activities.
State Environmental ApprovalMeet additional state-level requirements for waste oil handling and recycling.
Industrial and Construction ApprovalsAuthorize factory development and operation.
Fire and Safety ApprovalAddress oil storage and processing risks.

Federal and state requirements may apply simultaneously. For example, LASEPA regulates environmental activities in Lagos State. Investors should distinguish between regulations already in force and proposed regulations when confirming used oil management requirements.

Tanzania

Main regulatory authority: National Environment Management Council (NEMC).

Main legal framework: Environmental Management (Hazardous Waste Control and Management) Regulations, 2021, GN No. 389 of 2021.

Permit / DocumentPurpose
Company RegistrationEstablish the business.
Environmental Impact AssessmentAssess the project’s environmental impacts where required.
Hazardous Waste Management AuthorizationAuthorize applicable hazardous waste treatment and recycling activities.
Waste Collection / Transportation PermitsAuthorize collection and transportation where performed by the company.
Facility and Operational ApprovalsCover the treatment site, equipment, and operation.
Environmental Monitoring and ReportingDemonstrate compliance with applicable environmental conditions.

Tanzania’s hazardous waste regulations cover treatment, recycling, reuse, recovery, and disposal. A used oil re-refining facility should confirm its waste classification and treatment authorization requirements with NEMC.

Documents Required for a Used Oil Recycling Plant

Although each country has different application procedures, most regulators require similar company, site, environmental, and technical documents.

DocumentInformation Required
Company Registration DocumentsCompany name, legal representative, ownership, and registered business activities.
Investment DocumentsInvestment structure, project value, and foreign investment information where applicable.
Land Ownership / Lease AgreementProof of legal rights to use the project site.
Land-use / Zoning ApprovalConfirmation that industrial waste treatment is permitted at the site.
Project Feasibility ReportProject capacity, investment, production plan, and expected output.
Process Flow DiagramUsed oil receiving, storage, pretreatment, distillation, refining, and product handling.
Equipment SpecificationsCapacity and technical details of processing and pollution-control equipment.
Feedstock InformationTypes, sources, quantities, and waste classification of the used oil.
Environmental Impact AssessmentPotential impacts and mitigation measures.
Waste Management PlanStorage, handling, treatment, recycling, and disposal of residues.
Air Emission Control PlanExhaust gas treatment and emission-control equipment.
Wastewater Treatment PlanTreatment and discharge arrangements for oily wastewater.
Fire and Occupational Safety DocumentsFire prevention, equipment safety, and workplace protection.
Emergency Response PlanProcedures for oil spills, leaks, fires, and other incidents.

The process flow diagram and feedstock information are particularly important. Regulators need to understand exactly what types of used oil the facility will accept and how the plant will process them.

Typical Approval Process

StageMain ActionsKey Documents / Approvals
Company EstablishmentRegister the business and investment project.Company registration, investment documents
Site SelectionConfirm industrial zoning and land-use suitability.Land ownership or lease, zoning approval
Environmental AssessmentEvaluate air, water, soil, and community impacts.EIA or applicable environmental assessment
Waste Treatment AuthorizationApply to receive and process regulated used oil.Waste management plan, technical process documents
Construction and Factory ApprovalObtain permission to develop and install the facility.Construction and factory approvals
Equipment InstallationInstall recycling equipment and pollution-control systems.Equipment specifications, installation records
Inspection and OperationComplete required inspections and obtain operating authorization.Environmental and industrial operating approvals

The sequence may vary between countries. Some approvals must be obtained before construction, while others are issued after equipment installation and inspection.

Common Licensing Issues to Avoid

Common IssueWhy It Matters
Applying only for a waste collection licenseCollection authorization may not cover treatment or re-refining.
Not identifying the feedstock clearlyDifferent used oil types may have different waste classifications.
Choosing a site before checking zoningA general industrial site may not permit hazardous waste treatment.
Underestimating pollution-control requirementsThe plant may generate oily wastewater, exhaust gas, sludge, and spent filters.
Assuming one environmental permit covers everythingSeparate waste, factory, air, water, and fire approvals may be necessary.
Planning to import used oil without checking restrictionsInternational waste shipments may require additional approvals under the Basel Convention and national laws.

Frequently Asked Questions

If the used oil is classified as hazardous waste and the plant treats it, a hazardous waste treatment authorization may be required. The exact license depends on local regulations and the facility’s activities.

Possibly. Collection, storage, filtration, and treatment may be regulated separately. Investors should confirm whether the proposed filtration process is classified as waste treatment in the target country.

Many industrial waste treatment projects require an EIA or another form of environmental assessment. Requirements depend on project capacity, location, technology, and regulatory classification.

This depends on the country’s foreign investment rules, permitted business activities, ownership restrictions, and environmental licensing requirements.

A domestic waste treatment license does not automatically authorize imports. The Basel Convention and national hazardous waste import controls may apply.